Issue:
No Clash Have Been Identified Between the Models
Causes:
The Models are not aligned with each other.
The Autodesk BIM 360 (ACC) Model Coordination requires the models to be aligned in order to run a clash report
Solution:
- Aligns the models to run clash report.
- Two coordinate systems can be used:
- Internal Origin to Origin:
- This method requires all models to start at the exact same point. The best way to use this method is to build the models on top of each other, linking them together using the Internal Origin to Origin option when inserting them into the Revit project.
- Shared Coordinate:
- This is the easiest method to align the models that are not using the same Origin to Origin point.
- Internal Origin to Origin:
- Two coordinate systems can be used:
- Once models are aligned, publish them all to update on Autodesk Docs dashboard.
- Shared the published model to update the models in the coordinate space.
- Run the Clash with Model Coordination.
About the Author
Follow on Linkedin More Content by Gregory Lee